Total metres do not determine the reel count
Suppose an invented project needs two 4 m runs and one 2 m run, all cut from 5 m reels without joining pieces. The required total is 10 m, but two reels cannot supply it. Each 4 m run occupies its own reel and leaves only 1 m; neither remainder can supply the continuous 2 m run. Three reels are required, leaving 5 m spread across their remaining pieces.
The ratio of total required length to reel length, rounded up, is only a lower bound. It ignores the way whole runs must fit into individual pieces. Adding existing leftovers can reduce purchases, but only when their continuous usable lengths fit the required cuts.
The examples assume matching strip, permitted cuts at those lengths, no splicing and no cutting loss. A combined remainder is a stock account, rather than one continuous piece. Keep the per-piece remainder list for later use; two 1 m pieces cannot become one 2 m run under this model.
Round every run before allocating stock
A required length may fall between the manufacturer’s permitted cut marks. For cut interval δ in metres and target T, the supported choices are:
- Do not exceed the target: cut length = δ × floor(T/δ).
- At least reach the target: cut length = δ × ceil(T/δ).
The same rule applies to every requested row. Enter the interval in millimetres; the exact conversion is δ = interval/1,000. The rounding calculation is shared with the LED Strip Cut Length tool, so allocation uses the actual cut length rather than the unrounded target. For an artificial 4.37 m target and a 50 mm interval, the shorter rule supplies 4.35 m and the longer rule supplies 4.4 m. Their respective 0.02 m shortfall and 0.03 m excess remain part of the run specification.
Use the interval for the actual product. ENTTEC’s specified 50 mm interval for one particular pixel strip illustrates why the permitted cuts come from the product information; it is not a general interval for all LED strips. LED spacing and supply voltage alone do not establish cut positions.
A run which rounds down to zero whole intervals is rejected as unfulfilled. Selecting the longer rule can produce a physical piece, but it may then exceed a confined space. Connector dimensions, end caps, cable entries and mounting clearances must be allowed for when establishing the usable target and stock lengths.
The stock must share a usable cut origin
All entered stock must be the same compatible strip product. A leftover length is usable only from a permitted starting point, with an exact whole number of the supplied cut intervals. A damaged end, missing connector allowance or arbitrary mid-section measurement cannot silently become usable stock. Adjust the available length to a verified usable piece before allocating it.
Each required run is assigned wholly to one existing piece or one new reel. The planner never joins short remainders. If a run is longer than every available continuous piece and the new reel length, it is listed as unmet. Increasing the number of short reels will not resolve that length requirement.
An allocation accounts for lengths, not physical cutting order or installation suitability. Keep maximum connected run lengths and manufacturer installation conditions separate. An electrical limit can make a geometrically possible strip run unsuitable; this planner does not choose power supplies, wiring, protection or voltage-drop allowances.
Read the optimisation status with the allocation
For supported inputs, an exact search tries to minimise the number of new reels while allowing use of existing stock. The result is labelled minimum proved only when the search has exhausted the relevant alternatives or the allocation matches a mathematical lower bound. There may be several allocations with the same minimum reel count; the tool does not also promise the best remainder shapes or fewest cutting operations.
To keep automatic calculation responsive, input is limited to 18 individual required runs and 12 existing pieces, with at most 100,000 search states. Counts expand into individual runs or pieces before those limits are checked. If the search reaches its bound, a complete feasible allocation is retained where available and explicitly labelled as having an unproven minimum. It must not be described as optimal merely because it looks efficient.
Lengths and fit decisions retain exact finite-decimal cut intervals. Display precision therefore does not push a marginal run into a piece which is too short. This arithmetic precision does not establish manufacturing tolerances or measurement accuracy; keep practical usable lengths conservative according to the actual product and installation allowances.